Aligning the ceiling with plasterboard: the sequence of actions

Uneven ceilings are a problem thatEvery owner of an apartment or private house faces this problem during renovation work. This problem can be solved in several ways. One option is to level the ceiling with plasterboard. A level ceiling means a smooth base, leveled horizontally.Types of fixing the profile for plasterboardTypes of profile fastening for plasterboard.

How to level the ceiling gypsum plasterboard correctly

Return to Contents</a>Tools and materials for ceiling alignment Before , you need to prepare all the necessary tools and materials. You will need:Table of types of plasterboard.

  • Drywall. That, it will be necessary to get GKL thickness of 9,5 mm. Such devices allow to reduce the load on the main ceiling structure and to exclude the possibility of sagging hanging. If you plan to level the ceiling in the kitchen or in the bathroom, you should buy moisture-resistant gipsokartonnye sheets, since in this case there is a high probability of flooding neighbors from above.
  • Profiles of metal for the construction of frame construction. Elements should be guiding and carrying.
  • Adaptations for securing the frame: straight hangers, connectors for the elongation of metal profiles and their fastening at an angle. It should be noted that without such connectors it is possible to do by fastening the profiles directly with each other.
  • Dowels.
  • Self-tapping screws for gypsum board and metal.
  • Reinforcing tape, which is glued to the joints.
  • Fiberglass. This material is not necessary to purchase, but it is desirable, because with its help it will be possible to prevent the formation of cracks on the ceiling structure. This is especially true in new buildings, which often shrink.
  • Priming mixture.
  • Finishing putty.
  • Materials to be used for surface finishing. In this case, you can use paint, wallpaper, etc.
  • To level the ceiling with plasterboard sheets, you will need to purchase the following tools:Scheme of installation of plasterboard on a wooden frame of a suspended ceiling.

  • Perforator with drill to prepare holes in walls and ceiling.
  • Screwdriver, which will be needed for screwing self-tapping screws.
  • Shears for metal. Used to cut profiles along the length.
  • Hacksaw or knife for cutting plasterboard.
  • Building or laser level for marking.
  • Roulette.
  • A simple pencil.
  • Return to Contents</a>Preparatory work beforelevel the ceiling If the room has a concrete ceiling, then before leveling the ceiling, you will need to seal all the joints and cracks. This is necessary to improve sound insulation. If the house has wooden ceilings, they will need to be cleaned of plaster mix to make sure that they are in excellent condition and can withstand the weight of the suspended structure.An example of marking a ceiling frame for plasterboard.First of all, you will need to make markings. In this case, we will consider the alignment of the ceiling structure, while no figured or multi-level products will be made. The frame for the plasterboard ceiling can be installed at the minimum possible distance from the main structure - 2.5 cm. To make markings correctly, you will need to find the lowest point on the main ceiling, step back from it by 2.5 cm, and then put a mark on the wall. Using a water level, this mark should be transferred to all external and internal corners of the room. If you plan to build any lighting fixtures and other equipment into the ceiling structure, you will need to determine the lowest point and put down the height of the lighting fixtures from it. The level will be beaten off according to the new mark.Installing plasterboard sheets usingT-shaped stand. Between the marks that were applied to the wall, it will be necessary to draw control lines. This can be done with the help of an ordinary thread, which is wound on a cassette and covered with blueing. The thread will need to be pulled between several marks, after which, having pulled it a little, it is necessary to release it sharply. As a result, you can get a straight line, which can be used as a guide during the installation of the frame of the suspended structure, it will mean the lower limit of the frame. The frame will consist of several metal profiles, therefore it will be necessary to beat off several lines on the main ceiling. To do this, it is necessary to choose a corner of the room, which is close to 90 °. Next, you need to decide on the direction of the plasterboard sheets. During the installation, it is necessary to mark two opposite walls every 50 cm along the direction of the ceiling. After this, it will be necessary to sheathe the lines between the marks along the ceiling structure using a chokline.Scheme of a two-level ceiling with lamps.When transferring lines with a water level, you may come across flasks that will interfere. These devices rest against the main structure, so you will need to fill the level with water to capacity. To avoid this, the flasks must be removed. Self-tapping screws for plasterboard sheets should be used to secure metal profiles. It is imperative to check their quality as follows: if the self-tapping screw put on the nozzle does not fly off it in a horizontal position or with a slight downward tilt of the fastener, this means that it is of high quality. Return to contents</a>How to level the ceiling: installation of a metal frame The sequence of actions for installing the frame will be as follows:Scheme of a multi-level plasterboard ceiling.

  • The CD profile is inserted into the UD. The latter is screwed to the wall. The lower part of the device must coincide with the line that fought on the wall. The UD profile must be fixed to the plastic dowels with screws.
  • The appropriate diameter for the dowel in this casewill be 6 mm, for a screw - 4-5 mm. It should be taken into account that when purchasing a dowel-screw kit, you will not be able to find such a combination, since the screws will be thin. If the screw is less than 4 mm thick, and the dowel is 6 mm thick, the screw will not hold.
  • If there are no mounting holes in the UD profile, thenit will be necessary to do it every 40-50 cm. To do this, you need to attach the metal profile to the wall, then drill a hole in the profile and the wall at the same time. If the UD profiles are installed correctly, the ceiling will be flat.
  • On the lines on the main ceiling structureIt will be necessary to expose the hangers of the U-shape. The distance between them is 50-60 cm. In order to fix them to the ceiling, you will need to use dowels with screws. In this case, the ceiling dowel must have a small bonnet or flare on the sleeve so that it does not fall into the voids of the ceilings.
  • Next, the CD-profile needs to be trimmed. Its length should be 5 mm less than the distance between the walls. The product will need to be inserted into UD profiles under suspensions.
  • To align the CD-profiles under the frame it is necessarywill pull the nylon thread. It should be borne in mind that the profile can interfere with the leveling, and therefore each CD-profile will need to be tightened with an average U-shaped bar. This bar will be further bent under the profile.
  • Next, you need to align each individuallymetallic profile. To the suspension of the product are screwed with self-tapping screws. If the ends of the profiles stick out, they need to be bent to the sides, and then fasten the docking points of the UD and CD with the self-tapping screws.
  • Return to Contents</a>Leveling the ceiling with plasterboard:gypsum plasterboard lining It is worth noting that it is best to install gypsum plasterboard sheets by two people. One person will not be able to lift and screw the gypsum plasterboard on their own. In this case, self-tapping screws for metal are used for installation, which are 25 mm long. The installation step of these devices is 30 cm. The cap of the fastener must be recessed into the gypsum plasterboard sheet, otherwise it will interfere with the puttying later. However, you should also take care that the cap does not break the paper. To do this, it is recommended to use a special nozzle with a lampshade, which can fix the depth of immersion of the cap.Cassette ceiling installation diagram.The installation scheme of the sheets is simple: the outer part of the plasterboard sheet should lie on the CD profile, overlapping it by half. This is the only way to level the ceiling. The other half will be occupied by the next sheet. After installing all the sheets, you will need to start sealing the seams and installed fasteners. In some cases, the surface of the plasterboard sheets may be uneven, for example, a small groove may run along the edges of the material. Therefore, the plasterboard sheets will also need to be processed before applying finishing materials. For this, special gypsum-based mixtures should be used. The minimum layer thickness of such a mixture is 0.5 cm, the maximum is 5 cm. The solution is applied in a thin layer. If you cannot level the plasterboard ceiling in this way, you will need to apply this mixture in a thick layer. After applying the plaster, you will need to wait until it dries. Then it is rubbed with a hard sponge, which must first be moistened in water. This will eliminate the roughness of the base. Leveling the ceiling with plasterboard sheets is a simple process, you just need to prepare all the necessary tools and materials, and strictly follow the sequence of actions.