Walls

Alignment of walls with gypsum plasterboard: frameless or skeleton way

Various materials can be used to level the walls.materials, but plasterboard is popular among them. GKL is a durable and smooth material. It is used for various construction works. It acts as not only a leveling material, but also a base for finishing, since the surface of the GKL is smooth and even. It is easy to organize the alignment of walls with plasterboard. You do not need to have any special experience, and the installation method depends on the condition of the base.Scheme drywall sheetThe scheme of the plasterboard sheet. can be done by one of the following methods:

  • Frameless method, when using gluing GCR to the wall.
  • Wireframe method, when a special frame is first mounted, then it is clad with GCR.
  • The first method is used whenthe surface of the walls is relatively smooth and has no significant defects. This method allows you to avoid the cost of profiles. Wall cladding is done quickly. The second method is recommended when the wall has significant unevenness. In addition, additional insulation of the room from the inside is required. Special metal profiles or wooden slats are used as a frame, which are covered with plasterboard after installation.

    Frameless alignment

    Scheme of frameless method of wall finishingplasterboard. Frameless alignment of walls with plasterboard assumes that the gypsum board will be glued to the base. This will save time and money, but this method can only be used for walls with relatively small irregularities. How to level walls using the frameless method? This process includes the following stages:

  • The wall is cleaned of the old coating, then it is treated with a primer.
  • Drywall sheets are cut to the required elements, after which marking is applied to the surface for gluing them.
  • Special glue for GCR is mixed in the prepared container with a construction mixer, the composition should be homogeneous, without lumps.
  • Aligning the wall with plasterboard by handtoo it is possible, but it is required to prepare the glue composition in advance. It is diluted in the following proportion: for 13-15 kg of a dry mixture, 1 liter of pure water is used. After mixing, you should wait a few minutes before you start gluing sheets to the surface.
  • Apply the composition followed by small patches on the back surface of the GCR. The step is 20-30 cm, it is not necessary to level the glue, during the installation it will completely fill all the irregularities of the base.
  • The sheet is applied to the wall, it should be slightly taped with a rubber mallet to level the position.
  • If the wall is too curved, then it is additionally possible to glue the gypsum board strips to which the main sheets will be laid.
  • When laying, observe the minimum temperature gaps between the plates.
  • Return to Contents</a>

    Carcass leveling

    Scheme of wall covering with plasterboard on a metal frame. Alignment of walls with plasterboard begins with installation of a profile. The order of actions is as follows:

  • On the perimeter of the whole room is necessaryset the start profile. It is attached to the ceiling and the floor. Vertical guides are placed on the walls. Fasten the profiles with dowels, in the case of concrete walls, a perforator should be used. During the construction of the frame, the edges of the profiles are projected outward, so that the jumpers can then be fixed to them.
  • Then put the main profile, and it will be attached to the drywall. The profile edges must face the base.
  • The pitch of the profiles is 60 cm. This is enough to make a strong and reliable frame. in this case it will be easier. The edges of the sheets will fall on the profile surface.
  • In order to obtain a rigid structure, the use of transverse profiles is required. They are fixed on suspensions.
  • Once the frame is ready, you can beginsheathe the walls with plasterboard yourself. For this, 35 mm self-tapping screws are used. They are screwed in so that their heads are recessed into the material. The fastening step is 10-15 cm along the perimeter. If you need to install sockets and switches, you need to use special plastic cups with electrical wire outlets. Special round holes are made on the surface of the sheets. This work should be planned before the installation of the frame begins, since it will be difficult to find the outlets later. The frame method allows for additional insulation of the walls from the inside.Tools for finishing walls with plasterboard.It is best to use mineral wool for this, it is laid before the plasterboard sheathing. The heat insulator is laid tightly on the surface, there should be no gaps. To perform the work, you will need the following materials and tools:

    • drywall;
    • metallic profile;
    • self-tapping screws;
    • dowels;
    • perforator;
    • electric drill;
    • a knife for cutting GCR;
    • Screwdriver;
    • insulation (if additional heat and noise insulation is required).

    Return to Contents</a>

    Surface coating

    The final stage of wall alignment isapplying putty to plasterboard. Unlike regular walls, there is no need to lay the material on the entire surface. Plasterboard is smooth and even, so only joints and screw attachment points are puttyed. To perform the work, you need to prepare:

    • putty;
    • a container for mixing the mixture;
    • electric drill with a nozzle or a construction mixer;
    • clean water;
    • a primer;
    • grinding paper;
    • a metal spatula;
    • ribbon-serpyanku for joints;
    • metal perforated corner for external and internal corners of the surface.

    First, dilute the mixture, it's too much to cookIt is not necessary, it is better to do it in small portions. The mixture is applied to the joints as the first layer, lightly pressed into the surface. Serpyanka and the second layer of putty are applied on top. The same work is done with the corners, only here a perforated corner is used. The fastening places are covered with the prepared mixture. It must be leveled so that no protruding areas remain. When the putty dries, the surface must be carefully primed. The last step will be sanding with sandpaper. This should be done carefully, smoothing out all the irregularities. Now the wall is completely ready for finishing work. This can be painting, applying decorative plaster, gluing wallpaper. To level the walls, you can use drywall. It is ideal for this type of work. The slabs are smooth, they are easy to mount on the walls. Depending on the general condition of the base, you can use the gluing method of gluing gypsum boards or use sheathing on a frame made of profiles.</ ul>