ceiling

Warm ceiling with your own hands

Для создания комфортных условий проживания в доме it is necessary to solve the issue of heat conservation in it. In addition to thermal insulation of the floor and walls of the house, it is also necessary to insulate the ceiling. More than 50% of heat can escape through it. A warm ceiling in the house will reduce heat loss and reduce the cost of heating it in the cold season.Roof and ceiling insulation schemeScheme of insulation of roof and ceiling. In order to do this work correctly, it is necessary to know how to do it? It can be insulated in 3 ways:

  • from the inside of the room;
  • outside (from the attic space);
  • method of combined insulation (inside and outside).

Various materials can be used as thermal insulation. The most common of them are:

  • various types of mineral wool (roll or in the form of plates);
  • expanded polystyrene;
  • expanded clay;
  • warm slag;
  • sawdust;
  • warming mixtures based on clay and various polymer impurities.

Insulation, vapor barrier and ventilation schemeresidential attic. It is not difficult to make a warm ceiling with your own hands. First, you need to measure its area and prepare the necessary material. To perform the work, you will need the following material and tool:

  • heat-insulating material;
  • vapor barrier film;
  • waterproofing material;
  • bars measuring 50x50 mm;
  • a hacksaw on wood;
  • knife for cutting insulation;
  • perforator;
  • a hammer;
  • dowels;
  • self-tapping screws and nails;
  • building stapler.

External insulation

Insulation of the attic from the inside and outside.If the attic in the house is not used as a loft space, the best option would be to make external insulation from the attic side. To do this, you need to:

  • Clear the garret from garbage.
  • Cover the surface with a waterproofing material.
  • At the height of the insulation to be installedlag (for loose material about 200 mm high, for mineral wool or foam plastic about 100 mm). If the insulation is laid in the form of plates, the logs are set to their width.
  • The space between the lags is covered with a heaterup to the top edge or is filled with insulation plates (polystyrene or mineral wool). As a thermal insulation material, sawdust mixed with lime or clay can be used.
  • The surface of the laid layer is covered with a vapor barrier film.
  • Over the lag, in order not to damage the installed insulation layer and vapor barrier, a rough floor is installed.
  • Return to Contents</a>Insulation from inside the premisesScheme of the main heat losses of buildings.It is necessary to take into account that when installing an insulating layer from inside the room, the height of the ceiling will be reduced by its thickness. The best option is to install insulation when creating suspended or stretch ceilings. In this case, the insulation material is placed between the ceiling and the surface of the ceiling finish. Mineral wool in the form of slabs is used as insulation when using it indoors. It can be attached to the ceiling surface in 2 ways: with glue or inside the frame. When gluing, the following order of work must be observed:

  • The inner surface is cleaned from whitewash, to concrete.
  • On the base is applied a layer of soil (liquid diluted glue).
  • The adhesive is applied to the concrete base, the heat insulation plate is pressed against the base with force and held for 15 seconds. Similarly, all other plates are attached.
  • The gaps between the plates are filled with a mounting foam, after the foam has dried, the cut pieces are cut with a sharp knife.
  • A vapor barrier film is attached to the surface.
  • A polymeric mesh is glued to the surface, the surface is shpaklyuyetsya, cleaned and then carried out its finish trim.
  • When installing inside the frame, the order of work is as follows:

  • To install a false ceiling, a frame is installed. The carcass legs are fixed with a step equal to the width of the heater plates.
  • Between the logs, mineral wool is inserted.
  • Clearances are filled with foam. After it dries, the foam parts that come out are cut off.
  • A vapor barrier film is installed above the installed layer.
  • On the frame are installed sheets of plasterboard.
  • The surface is prepared for finishing.
  • An insulated ceiling will create comfortable living conditions in the house, significantly reduce heat loss and allow you to save money on energy bills.

    Comments